SEPTA Emergency Work – December 11, 2021

Be advised that SEPTA will be performing emergency rail repairs on the South Warminster Road grade crossing on Saturday, December 11, 2021 at 7:00 AM. Work is scheduled to conclude by 11:59 PM on Saturday, December 11th.

SEPTA will close S. Warminster Road on or about 7 AM on Saturday, December 11th and will reopen the road once work concludes.

A detour will be posted to direct vehicles away from the work zone. Traffic will be detoured around the crossing closure from Warminster Road via Byberry Road and York Road. Detour signs will be posted in advance to notify motorists of this upcoming closure.

Motorists should try to avoid this area altogether on December 11, 2021 to prevent possible delays.